New Restroom is finished
Hallway Restroom Off the Sanctuary Project
The sanctuary restroom was constructed by a combination of contractors and HTLC volunteers. Olin Bell recommended the contractors based on his experience. The carpenter relocated the closet door and built a new restroom door and door frame that matches the existing style of doors. The drywall contractor installed the new walls, covered them with drywall and finished them to a smooth surface. They also installed the new suspended ceiling. The electrician installed the restroom and hallway ceiling lighting, the restroom ceiling fan and wall outlet. The plumber installed the water lines, the sink and the point-of use water heater. He also installed the sewer lines and toilet. Another contractor installed red carpet on the steps that had been extended. The piece of red carpet used was saved from the restroom floor area. HTLC volunteers undertook the painting of the restroom walls, door and the hallway walls. Much work had to go into prepping the lower wall areas for repainting. Those walls had been covered with oil based paint that had to be sanded and cleaned prior to the paint application. Also, vinyl plank flooring was installed as the restroom floor covering. Thanks to Mike Cox, Ernie Thorns, and Tom Weeks for their hours of hard work and to Jill Helgeson for her decorating guidance.