Spring Congregation Work Day Saturday March 18th update
The chance of rain never materialized so we had a pleasant but cool and breezy morning.
Skip Knight, Dan Hunnicutt and Ernie Thorns trimmed the twelve shrubs along the side of the handicap ramp and Education Building. The clippings were raked up and moved to the pickup area at the side of the front parking lot. Also, the steps to the furnace room were swept of leaves and debris to keep the drain clear.
Jeff Eckardt cleaned and wiped down all of the playground equipment removing dirt and mold that accumulated on the surfaces over winter. Cobwebs were cleaned out of the playhouse.
Barbara Cleveland cleaned the Fellowship Hall side garden and planned future plantings.
Edna Moore weeded and cleaned the Prayer Garden and removed dead material.
Thanks to the participants for working to maintain our facilities fine appearance.